ANNUAL ACTION PLAN 2007-08
GUIDELINES FOR IMPLEMENTATION OF MICROIRRIGATION UNDER LIFT IRRIGATION PROJECTS
 

Identification of suitable lands for Micro Irrigation: -

 

Irrigation Department will finalize the projects to be brought under micro irrigation and to provide the information to Commissioner of Horticulture. The information should contain the necessary details such as name of districts, name of irrigation projects, total area being proposed under Microirrigation, latest sub division details, topo details and survey No. wise and farmer wise data of such lands along with details of alignments of the canal and distribution net work.

 
Allocation of areas to MI companies: -
 
The Commissioner of Horticulture will allocate areas to the empanelled MI companies based on their capabilities and performance under regular APMIP. The allotee MI companies will implement the programme by positioning of sufficient staff in addition to the regular APMIP staff, making available sufficient material at strategic locations. MI company should take up the designing of the MI system with their own resource, however involving APMIP, Agriculture, Horticulture, Irrigation Departments and Microirrigation Rythu Mithra Groups (MIRMG) concerned. MI company will also take up identification of the location for sump, appropriate design for pipe net work and suitable pump set of required capacity, while involving irrigation department.
 
Survey, Investigation and design from Subminor to farmer field: -
 
Survey, design and report preparation from sub-minor to farmer field will be under taken by MI companies in their allocated areas to facilitate installation of water carrier systems, location of sumps and layout of water distribution network. In this process pipe network will be considered in place of field channels.
 

Location of Suitable site for construction of sump: -

 

MI company will suggest the location of sump keeping in view geographic area, topo details of lands including survey No., village, mandal, number of farmers involved, etc., as per the approved project report. Irrigation department will also be involved in this process. The location of sump is to be determined basing on the location of main and sub main in such a way as to cater to 10-15 acres and also to keep the cost of feeder lines up to sump to feed water from sub minors to sumps at the minimum.

 
Execution of works up to sump: -
 
The designs prepared from sub-minor to sump will be approved by Irrigation Department. The Irrigation department will execute the works of laying water carrier system from sub-minor to sump and make payments, while following the norms of Irrigation Department for procurement of material, payments and execution.
 
Designing of sump: -
 
Sumps are required to store water during non-pumping hours and to provide sufficient volume to cover individual block of 10-15 acres. Land acquisition if any, construction of sump and lining is to be taken up by the Irrigation department. Sump capacities are to be decided keeping in view the duration of power supply and operational frequency of canal network. The sump will also be fitted with Pump set of suitable capacity.
 
Installation of suitable pump set: -
 
Suitable pump set of required capacity as per the norms prescribed under APMIP is to be recommended by MI company basing on the water discharge, head and the area. The pump sets must be invariably the ISI graded of repute make and the PD, DWMA will procure the pumpset of the choice of MI-RMG, out of the brands approved by PMU, Hyderabad. The rates and brands will be finalized by the Project Management Unit, Hyderabad, while keeping in view of the rate contracts finalized by respective departments at state level.
 

Energization and commissioning of pump set will be undertaken by MI-RMGs with the assistance of the Irrigation department

 

Detailed survey of the allocated area by MI company: -

 

The MI Company so allotted to a particular block will conduct thorough survey of the lands involving the farmers concerned and Irrigation Department. The land suitability for a particular type of Microirrigation (drip or sprinkler) has to be examined by conducting the soil test and ascertaining availability of water (discharge and duration). MI companies should workout a design of MI system specific to the field situations.

 

Survey, Investigation and design from sump to farmer point: -

 

MI company will prepare the design suitable to the specific situation of field. PD, DWMA, shall scrutinize and approve the designs. The work from sump to farmer’s field will be executed by respective MI company under the supervision of PD, DWMA. The payments will be made by DWMA after ascertaining the completion of work by obtaining the installation completion certificate as per the prescribed norms.

 

Underground water distribution network: -

 

Release of water to Sumps: -

 

The Irrigation department will take necessary action for release of water into sumps as per the design requirements. Scheduling of release of water is to be furnished by Irrigation Dept. Drawl of water from sump to the farmer will be taken up by the RM Groups while maintaining perfect harmony among themselves.

 

Suitable crops: -

 

PD DWMA has to under take the examination of fields. Basing on the soil fertility, soil type, climate and Agro climatic conditions, PD shall propose the suitable crops to the MI Rythu Mithra groups, while keeping in view of the duration of water availability, the discharge of water and other parameters. APMIP would also prescribe the types of crops suitable, however the decision of MI Rythu Mithra groups is final in deciding the crops out of the proposed crops by team.

 

Water requirements: -

 

The PD DWMA and MI company concerned will workout the water requirements of the crops so identified and accordingly the MI system has to be designed.

 
Formation of user groups: -
 

The Irrigation department will provide the survey No. wise and farmer wise list to PD DWMA. The Project Director, DWMA, assisted by irrigation department will constitute sump wise MI Rythu Mithra Groups with a specific name duly facilitating the election of office bearers ie., President, Secretary, and Treasurer or any other as per the need. The proceedings of the meeting and election are to be reduced to writing. During this process the representatives of PRI and Village Secretary and Watershed Committees wherever available, will be involved. The database of all groups has to be maintained by PD, DWMA at the district level and also at the state level at PMU.

 

Capacity building to MI Rythu Mithra Groups: -

 

Pre installation stage: - Prior to the installation of MI system the farmers are to be thoroughly sensitized by PD DWMA, Irrigation department and MI Company concerned on the advantages of Microirrigation. PD DWMA will also organize an exposure visits to farmers. MI Company will also impart training on the issues like system maintenance, Acid treatment, and fertigation, etc.

 

Post installation stage: - The MI Rythu Mithra groups are to be trained on the sharing of water, maintenance of sump, operation and maintenance of pump set, pipe net work and MI system. The Project Director, DWMA would facilitate the MI Rythu Mithra groups to have a bank account in the name of the user group ie. _______ MI Rythu Mithra Group. A Development fund should be created with the contributions from the members of MI Rythu Mithra groups for meeting the maintenance charges. The volume of contributions will be decided by the MI Rythu Mithra groups.

 

Credit tie-up:- The non subsidy amount of MI system cost has to be collected and deposited with PD DWMA prior to the sanction of system. District Collectors would facilitate the credit tie-up with banks while incorporating the credit requirement in District Credit Plan, and every effort will be made by PD DWMA and MI companies for making MI Rythu Mithra groups to access institutional finance for providing non subsidy portion of MI system.

 

Procurement of material: Horticultural department will procure the material required for installations beyond sump up to hydrant which includes pump set PVC/HDPE pipes as per the rate contract fixed by government / DRDA/RWS as the case may be. The materials so procured will confirm to the standards of ISI as fixed by BIS.

 

Supply and installation of MI system: - The laying of the water distribution network and supply of MI systems will be taken up by MI Company as per the design given by them after receipt of administrative sanction from PD DWMA.

 

Inspection of system: - Inspection of the pump sets, water distribution network and MI systems will be taken up as done under regular APMIP duly obtaining the status of satisfaction certificate from MI-RMG concerned. Accordingly, sanction and payments of MI system cost and pipe network to the MI Company will be done by PD DWMA.
 

Performance Guarantee: - The MI Company will execute performance guarantee of the MI system including Pipe network installed by them for a period of 5 years against manufacturing defects and a copy of Guarantee shall be provided to the MI Rythu Mithra group concerned.

 

After sales Service: - As in regular APMIP, after sales service will be provided to the MI systems installed by MI companies for 2 years as per the agreement.

 

Maintenance of MI systems: - Maintenance of the pump sets; water distribution network and MI systems during on season and off season will be taken up by MI-RMG concerned under the guidance of officials of Irrigation Department and MI companies.

 

Extension Services: - Regular extension services are to be provided by the Agriculture Department, Horticulture Department and Sericulture Department as the case may be; however MIAOs and MIDCCs of APMIP will also constantly extend Agronomic support.

 

Marketing Facilities: - Marketing department will guide the MI Rythu Mithra groups in marketing their produce for getting remunerative prices, and also arrange for storage of Agri produce.

Insurance of MI systems: - Insurance of the pump sets, water distribution network and MI systems will be done as per existing norms of APMIP.

 

District level committee :- The District level committee is constituted under the chairmanship of District Collector, consisting of Joint Collector, PD DRDA, JD Agriculture, ADH, AD Marketing, DD Ground water, SE of the project concerned, LDM, AGM NABARD & the district coordinators of Banks as members with PD DWMA as convener and it will meet regularly and review the progress and performance

   
   