OIL PALM (one hectare) - Without drip irrigation system

Varieties

Tenera, a hybrid of Dura and Piscifera

Spacing

9 x 9 (triangular system)

Planting density

143

S.No

Item of expenditure

 Units

Year 1

Year 2

Year 3

Year 4

Total

I

Material

 

 

 

 

 

 

1

Planting material including 10% casualty replacement in second year

Seedlings

7865

770

 

 

8635

2

Manure and fertilizer

 

3259

5088

7007

9281

24635

3

Drip irrigation system for mono crop

 

 

 

 

 

 

4

Plant protection

 

600

600

1200

1200

3600

5

Intercrop

 

0

0

 

 

0

6

Fencing

 

0

 

 

 

0

 

Subtotal

 

11724

6458

8207

10481

36870

II

Labour

 

 

 

 

 

 

1

Land preparation

LS

1750

 

 

 

1750

2

Digging,filling and planting@Rs. 15/plant

 

2145

 

 

 

2145

3

Manure and fertilizer application

4

240

240

240

240

960

4

Pesticide application

2

120

120

120

120

480

5

Irrigation

5

300

300

300

300

1200

6

Interculture operations

10

600

600

600

600

2400

7

Harvesting (@ Rs. 150 per ton)

150

 

 

 

600

600

8

Watch and ward

 

 

 

 

1000

1000

 

Subtotal

 

5155

1260

1260

2860

10535

III

Contignencies

5%

844

386

473

667

2370

 

Total (rounded off)

 

17700

8100

9900

14000

49700

Unit cost capitalised upto 4th year
(without drip irrigation system)

49700

Repayment period    

10 years inclusive of 5 years grace period

Installments

Annual